The transfer is part of the shift

In most plans, personnel transfer appears as a number of vehicles. On site, it decides how the day begins. If the vehicle is ten minutes late, the crew starts ten minutes late. When the journey runs past an hour or the vehicle is overcrowded, the crew starts work tired.

The planning side

  • Route and duration. The road between accommodation and site is measured with the traffic at that time of day.
  • Departure times. Calculated backwards from the shift start, allowing for site entry and preparation time.
  • Capacity. The number of vehicles is set by the busiest shift.
  • Backup. The vehicle and driver that step in after a breakdown or delay are known in advance.
  • Driver hours. Drivers’ working and rest periods are built into the plan.

The comfort side

Comfort is not a luxury. It is part of safety and productivity. An air-conditioned, well-maintained vehicle, a seat for everyone and a short wait directly affect how well a crew holds up on a long project. A crew doing work that demands attention should arrive rested, which also lowers the risk of accidents.

How is the balance found?

Carrying the most people with the fewest vehicles is the most economical solution on paper. In practice, long routes with many stops stretch the journey, and completely full vehicles remove all flexibility. A balanced plan keeps occupancy at a reasonable level, limits the number of stops and leaves room to move at shift changes.

It cannot be planned alone

A transfer plan works when it is considered together with the location of the accommodation and the meal times. When the accommodation is chosen close to the site, fewer vehicles are needed. When breakfast is timed to the departure, there is no waiting in the morning. This is why HYK runs fleet logistics inside the same plan as accommodation and catering.